The Vaibhava–Kengeri Project has obtained all necessary approvals from BDA.NOCs from BESCOM, Pollution Control Board and Panchayat have also been obtained.

WE ARE PLEASED TO CONFIRM THE FOLLOWING CONSTRUCTION PROGRESS:

  • A1 Block: Possession in Progress.
  • A2 Block: Possession in Progress.
  • A3 Block: Possession in Progress.
  • A4 Block: Possession in Progress.
  • B1 Block: Possession in Progress.
  • B2 Block: Possession in Progress.
  • B3 Block: Possession in Progress.

THE STATUS OF CONSTRUCTION AS ON 1st AUGUST 2016 IS AS FOLLOWS:

 

 LEVELS A1 A2 A3 A4 B1 B2 B3
Excavation Tick Tick Tick Tick Tick Tick Tick
Footing Tick Tick Tick Tick Tick Tick Tick
Grade Slab Tick Tick Tick Tick Tick Tick Tick
Stilt Tick Tick Tick Tick Tick Tick Tick
1st Floor Tick Tick Tick Tick Tick Tick Tick
2nd Floor Tick Tick Tick Tick Tick Tick Tick
3rd Floor Tick Tick Tick Tick Tick Tick Tick
4th Floor Tick Tick Tick Tick Tick Tick Tick
Completion of Vitrified Tiling Tick Tick Tick Tick Tick Tick Tick
CP & Sanitary Fitting Tick Tick Tick Tick Tick Tick Tick
On Possession