VBHC Greendew – Construction Updates

Construction at Vaibhav-Palghar Greens project started in April 2014 and has been going at a smooth pace. Vaibhav-Palghar Greens has 8 G+4 blocks – Ax1, Ax2, Ax3, Ax4, Ax5, Ax6, C1 and D1. Construction of each block can be divided broadly in four stages: Excavation, Sub-structure (grade slab), Super-structure (ground floor to terrace), and Finishing (water proofing, tiles, kitchen works, lifts, etc.). C1, AX2, AX1, AX3, AX4, AX5, AX6 & D1 Block possession done. Landscape development on both the sides of the road is completed of the project. Main Road heading towards B-parcel & Internal road work has been completed, vehicle moment has been started.

WE ARE PLEASED TO CONFIRM THE FOLLOWING CONSTRUCTION PROGRESS:

  • AX1 Block: Possession Done.
    AX2 Block: Possession Done.
    AX3 Block: Possession Done.
    AX4 Block: Possession Done.
    AX5 Block: Possession Done.
    AX6 Block: Possession Done.
    C1 Block: Possession Done.
    D1 Block: Possession Done.

THE STATUS OF CONSTRUCTION AS ON 29th MARCH 2016 IS AS FOLLOWS:

BLOCK EXCAVATION STILT 1ST FLOOR TERRACE FLOORING POSSESSION
AX1 Tick NA Tick Tick Tick Tick
AX2 Tick NA Tick Tick Tick Tick
AX3 Tick NA Tick Tick Tick Tick
AX4 Tick NA Tick Tick Tick Tick
AX5 Tick NA Tick Tick Tick Tick
AX6 Tick NA Tick Tick Tick Tick
C1 Tick NA Tick Tick Tick Tick
D1 Tick NA Tick Tick Tick Tick